Energimyndigheten Söksida
Sökresultat
Din sökning på gör en energikalkyl gav 7026 träffar
Sortera efter:
Relevans
Datum
Utvald träff
ERANetSmartGridsPlus_2016 Call Text.pdf
- 1 -
European Research Area Network – Smart Grids Plus
Call for proposals
Opening of call 18 April 2016
ERA-Net Smart
Utvald träff
Förstudie revision disk hushåll_20171116_JRC106993.pdf
Ecodesign and Energy Label for
Household Dishwashers
Preparatory study
Final report
Boyano A., Moons H., Villanueva A. (JRC-EC)
Graulich K., Rüdenauer I. (
Utvald träff
EuP_Lot5_Task3_August2012_FINAL.pdf
Energy-Using Product Group Analysis - Lot 5
Machine tools and related machinery
Task 3 Report – User Requirements
Sustainable Industrial Policy -
Utvald träff
Förstudie utrustning bildbehandling-1.pdf
EuP Preparatory Study Lot 4 (IE) Final Report Task 1 12th November 2007
T1 page 1
Report for Tender No. TREN/D1/40 lot 4-2005 Fraunhofer IZM
EuP Preparatory Studies
“Imaging
Andra har också sökt
Utvald träff
Review study on labelling of tyres _ DraftFinalReport29Febr2016.pdf
1
Draft Final Report
Review of the Tyre Labelling Regulation
Prepared by Viegand Maagøe A/S
Contract manager and quality control: Van Holsteijn en Kemna B.V. (VHK)
Utvald träff
Review study standby regulation - draft final report april 2017.pdf
1
Review study on Standby Regulation
Study on the Review of the Regulation (EC) No 1275/2008
Final report
Utvald träff
EPS Review_Additional Assessment_up-dated Final Report.pdf
European Commission - Directorate-General for Energy
Framework Contract ENER/C3/2012-418-Lot 2
ADDITIONAL ASSESSMENT IN THE
FRAME OF THE REVIEW STUDY ON
COMMISSION REGULATION (EC) NO.
278/
Utvald träff
Addendum report fixed double duct.pdf
1
Review of Regulation 206/2012 and
626/2011
Air conditioners and comfort fans
Addendum regarding fixed double duct air
Utvald träff
Ecodesign_Kettles_Task_3_20201218_V27_Final.pdf
Team:
Contract technical team leader: Antoine Durand (Fraunhofer ISI)
Contractors: VITO (Belgium) and Fraunhofer ISI (Germany)
18.12.2020
Preparatory study for Kettles
Utvald träff
Ecodesign_Kettles_Task_4_20201214_V16_Final.pdf
Team:
Contract technical team leader: Antoine Durand (Fraunhofer ISI)
Contractors: VITO (Belgium) and Fraunhofer ISI (Germany)
14.12.2020
Preparatory study for Kettles